top of page

In Serra do Salitre, Galvani is building a mining-industrial complex dedicated to mining, phosphate rock and fertilizers production for agriculture.  

Will everything be ready at once?

The project is divided into two phases. In the first, the mining unit starts operating, due to be ready by 2018. The ore produced at this time will be industrialized at the Galvani plant in Paulínia, as fertilizer plants will not be ready yet. When the second phase of the project is finalized in 2019, it is that chemical plants begin to be operated, and there we will have the fertilizer production in Serra do Salitre.

Will everything be ready at once?

The project is divided into two phases. In the first, the mining unit starts operating, due to be ready by 2018. The ore produced at this time will be industrialized at the Galvani plant in Paulínia, as fertilizer plants will not be ready yet. When the second phase of the project is finalized in 2019, it is that chemical plants begin to be operated, and there we will have the fertilizer production in Serra do Salitre.

Mining-Industrial Complex, what is that?

In Serra do Salitre, Galvani will count on a unit that will produce from ore to fertilizer ready for farmer's use. Thus, there will be a mining unit, responsible for extracting phosphate rock from soil and transforming it in raw material for fertilizer production. Industrial factories will be responsible for transforming this raw material into mineral fertilizer.  

infografico.jpg

Will everything be ready at once?

The project is divided into two phases. In the first, the mining unit starts operating, due to be ready by 2018. The ore produced at this time will be industrialized at the Galvani plant in Paulínia, as fertilizer plants will not be ready yet. When the second phase of the project is finalized in 2019, it is that chemical plants begin to be operated, and there we will have the fertilizer production in Serra do Salitre.

Quando a operação de CMISS estiver produzindo a 100% da sua capacidade, Serra do Salitre adicionará 1 MMT de fosfato à atual produção anual da EuroChem de 5 MMT.  

Atualmente, o Grupo possui duas minas de fosfato: a instalação Kovdorskiy GOK no norte da Rússia e a EuroChem Fertilizantes no Cazaquistão, e fabrica produtos comerciais de qualidade premium MAP, DAP, NP e fosfatos de ração em vários locais de produção na Rússia e Lituânia. 

A EuroChem é um dos principais produtores globais de fertilizantes de nitrogênio, fosfato e potássio. O Grupo está verticalmente integrado com atividades que abrangem a mineração até a produção, logística e distribuição de fertilizantes. A EuroChem iniciou a produção de potássio em seu site Usolskiy em 2018 e, desde então, aumentou a produção para a fase 1 com capacidade operacional de 2,3 MMT por ano.  O Grupo continua a desenvolver um segundo projeto Greenfield em VolgaKaliy, na Rússia. Com sede em Zug, Suíça, o Grupo opera instalações de produção na Europa, Ásia e CIS, empregando mais de 27.000 pessoas. No Brasil, a empresa opera 10 fábricas próprias e terceirizadas de misturas de fertilizantes no Centro-Norte Brasileiro, tendo posição de destaque nessas regiões.